From nationwide installations to specialized industrial work, our projects reflect a deep commitment to quality, safety, and innovation delivering reliable solutions that meet the evolving needs of our clients across commercial, residential, and public sectors.
Shell Gas Station
Completed installation of dual DC fast chargers at a retail center, including electrical work.
2025
Stellantis CTC Lot
Auburn Hills, MI
Designed and deployed a portable EV charging solution equipped with DC fast chargers.
2025
Town and Country Ford
Charlotte, NC
Installed EV chargers with electrical panel upgrades, conduit work, and underground trenching.
2025
Whole Food Midtown
Detroit, MI
Performed a lighting retrofit to upgrade existing fixtures and improve energy efficiency.
2025
Cloverleaf Plaza
Southfield, MI
Completed installation of dual DC fast chargers at a retail center, including electrical work.
2024
Keehn-Griffin Funeral Home
Serviced pole-mounted lighting with connection checks and fixture maintenance.
2025
Vicksburg CDJR Portage
Vicksburg, MI
Installed a DC fast charger along with Level 2 chargers, including electrical work.
2024
Ross Dress for Less
Flint, MI
Demo existing electrical and new electrical built-out
2024
Ross Dress for Less
Petoskey, MI
Demo existing electrical and new electrical built-out
2024
Amoco Gas Station
Stevensville, MI
Completed installation of DC fast chargers, including all supporting electrical infrastructure.
2024
Shelter Bay Animal Hospital
Novi, MI
Performed a complete site remodel, including full electrical upgrades.
2024
Chrysler Dodge Jeep Ram of Troy
Troy, MI
Completed installation of DC fast chargers, including all supporting electrical infrastructure.
2024
DeNooyer Ford
Vicksburg, MI
Completed installation of DC fast chargers, including all supporting electrical infrastructure.
2023
Lakeview Ford
Installed three DC fast chargers and ten Level 2 chargers as part of a full-site deployment.
2023
Hage Automotive
Detroit, MI
Completed installation of DC fast chargers, including all supporting electrical infrastructure.
2023
Shell Longview Texas
Longview, TX
Completed installation of a high-capacity DC charger with full electrical setup.
2023
Ross Dress for Less
Ann Arbor, MI
Performed general electrical work, including power distribution and wiring.
2023
Ray Laethem Buick GMC
Detroit, MI
Completed commissioning of one DC fast chargers and Level 2 chargers
2022
Bay Mills Casino
Brimley, MI
Completed installation of a high-capacity DC charger with full electrical setup.
2022
Lasco Ford
Fenton, MI
Performed a lighting retrofit to upgrade existing fixtures and improve energy efficiency.
2022
Detroit Water Department
Detroit, MI
Installed new power infrastructure and deployed 25 Level 2 EV chargers.
2025
MPD City of Detroit
Detroit, MI
Installed DC fast chargers to enhance rapid EV charging capabilities.
2023
Cheboygan City Hall
Cheboygan, MI
Installed DC fast chargers to enhance rapid EV charging capabilities.
2023
City of Traverse City
Traverse City, MI
Installed DC fast chargers to enhance rapid EV charging capabilities.
2022
City of Grayling
Grayling, MI
Installed DC fast chargers to enhance rapid EV charging capabilities.
2021
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Installed a backup generator for residential emergency power support.
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Emergency Residential Service – Repaired a Faulty Home EV Charger
2024
Resident Site
Urgent Site Repair for Excavator-Caused Electrical and Pipe Damage
2023
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025
Resident Site
Performed trenching and full-service electrical installation with panels and meter setups.
2025
Resident Site
Completed site work and installation for a residential
Level 2 EV charger
2025